Starship Flight 12 — Version 3 Launch Fund
SpaceX

Starship Flight 12 — Version 3 Launch Fund

The first flight of Version 3 Starship. A new era of fully-reusable heavy-lift launch capability begins at Starbase, Texas.

22%–90%

Expected Yield

$1,000

Min. Investment

$475.0M

Raised

0

Investors

161d

Days Left

$475.0M raised60.4%
of $786.0M161d left

Min. investment: $1,000 · Goal: $786.0M

Scroll to explore

The Opportunity

Why This Project

Starship Flight 12 marks the inaugural test flight of SpaceX's next-generation Version 3 Starship — the most powerful and most capable launch vehicle ever built. Scheduled for liftoff from Starbase, Texas in May 2026, this milestone flight follows the successful orbital demonstrations of the Flight 6–11 series and introduces a suite of structural, propulsion, and reusability upgrades engineered for sustained high-cadence operations. Version 3 Starship features a redesigned heat shield, upgraded Raptor 3 engines delivering over 280 tonnes of thrust each, and a fully automated catch-and-relaunch system targeting same-day booster turnaround. This is not a prototype — it is the production vehicle. The Starship Flight 12 Launch Fund provides qualified investors with direct financial exposure to the commercialisation of Starship as a payload delivery platform. Capital is deployed across launch infrastructure expansion, V3 production scaling, and the first contracted commercial payload manifest that Flight 12 and its successors will service. With launch contracts from NASA (Artemis), the US Department of Defense, and private satellite operators, Starship's commercial revenue pipeline is tangible and growing. Investors in this fund are positioned at the inflection point — before full operational cadence and the re-rating of SpaceX's launch economics that follows.

  • First test flight of Version 3 Starship — redesigned for 24-hour launch turnaround and 10× higher payload throughput
  • Raptor 3 engine upgrades: each engine delivers ~280 tonnes thrust; Starship carries 33 on the booster alone
  • Fully automated tower catch system proven on Flights 9–11 — booster reuse cadence now mirrors aircraft operations
  • Commercial manifest locked: NASA Artemis, DoD national security payloads, and private constellation contracts
  • Early-round investors access pre-commercial-scale valuations ahead of the Starship operational certification milestone

Project Metrics

Projected Yield22%–90%
Yield TypeOn Exit
Raise Target$786M
Minimum Entry$1,000
Active Investors0
Risk ProfileMedium Risk

Investment Tiers

Choose Your Entry Point

Returns

Calculate Your Investment

Investment Calculator

Estimate your projected returns.

$
$1,000$24,999

Projected Return

$220 – $380

Total Value

$1,220 – $1,380

Based on 22%–38% projected yield for the Explorer tier. Projections are estimates, not guarantees.

Timeline

Project Milestones

Mar 2026

Version 3 Starship Full Assembly

Ship 35 (V3 prototype) fully stacked with Super Heavy Booster 14 at the Starbase integration facility.

Apr 2026

Raptor 3 Static Fire — Full Booster

33-engine static fire of Super Heavy Booster 14 validating V3 propulsion performance.

May 2026

Flight 12 Launch — Starbase, Texas

First orbital test flight of Version 3 Starship. Booster catch attempt at Mechazilla tower. Ship reentry and ocean splashdown or catch.

Jul 2026

Post-Flight Data Review & V3 Certification

FAA review of Flight 12 data; SpaceX internal certification of V3 design for operational manifest.

Oct 2026

First Commercial Payload — Flight 13

First contracted commercial payload launched on a production V3 Starship.

Jun 2027

Investor Yield Distribution

Fund exit and yield distribution following first operational commercial launch cadence confirmation.

Due Diligence

Project Documents

Limited Availability

Secure Your Position

Spots across all tiers are limited. Once filled, this offering closes regardless of the deadline.

This is not an offer to sell or a solicitation of an offer to buy securities. Investment in private market opportunities involves significant risk, including the potential loss of your entire investment. All projected yields are estimates based on current models and are not guaranteed. Past performance does not indicate future results. Please review all project documents carefully before investing.